Konya Tramway Implementation Projects

Project works have been carried out for Konya Metropolitan Municipality for the extension of the existing tram line in the direction of Mevlana Street, Fetih Street Junction - Ereğli Beltway Junction.
It is aimed to extend the existing line arriving at Alaattin Hill to continue on Mevlana Street, to reduce the road traffic in the area with historical buildings and to provide transportation to the developing residential areas.


The length of the tram line between Alaattin Hill and Ereğli Junction is approximately 5 km. The route with 8 stations is connected to the storage area and maintenance-repair facility for the rail system vehicles at the end. As a result of the Feasibility Report, it is planned to provide required capacity even in the case that the number of vehicles increases in the future.

  • Province KONYA
  • Country Türkiye
  • Client

    Konya Metropolitan Municipality

    Department of Development and Urbanization

  • Work Schedule 2008-2009
  • Scope of the Work

    Preliminary Project

    Feasibility Study

    Implementation Project

    Capacity Calculations

    Route Design

    Line Superstructure and Design

    Line Type Sections and Clearances

    Station Layout Plans

    Storage Area and Workshop Design

    Mechanical Installation

    Electrical Installation

    Electro-Mechanical Systems

    Electrification

    Signalization

    Vehicle Specifications for the Line

    Geology

    Soil Surveys

    Infrastructures

    Drainage

    Investment Costs